Forskjell mellom versjoner av «Småjobber i Brenneriveien»

Fra Bitraf
Hopp til navigering Hopp til søk
m (attribute the work done)
(move some tasks to done)
(21 mellomliggende revisjoner av 2 brukere er ikke vist)
Linje 1: Linje 1:
When a job is done, move it from the "to do" to the "done" list, and put your name (or username if you prefer, use a link with the "User:" prefix).
+
When you enter, look straight ahead, and by the stairs there is a flip chart and a whiteboard with småjobber that can be done to help Bitraf get up to speed! There are whiteboard pens available there to mark off when done and please put your name so we can say thanks later!
 +
 
  
 
==Things that need to be done==
 
==Things that need to be done==
* Throw away all wood trash outside sewing room upstairs in the corridor (isekk will be borglf) or you can buy and get your money back if you want to. There is more stuff that can go in the isekk too! Ask Yoshi/Nikolai/Thomas.
+
* Are on the whiteboard, pls mark when done and put your name!
* Put PG4 office dividers on Finn.no, 200 kr pr piece. Ask Thomas if you need more info.
+
*Anything you don't know/understand, can ask Yoshi or Thomas Winther on Slack. Other members may also know!
* Diagnose and fix the base of the lightbox in the workshop upstairs, by the sink and window next to teknisk rom.
+
 
* Once fixed, carry it down to the lab and find a home for it that adds to the lab hygge.
+
== Things that are in progress ==
* The lightbox in the workshop leaning against the trolley of rubber mats (it has no base) - Put on Finn.no for free.
+
 
* Build the trancher table (Ikea Bikvam) near the shopbot in the workshop upstairs and setup the shopbot computer (currently on the booths) on it. Lead electricity there please!
+
Here are the responsible people for each section of Bitraf, ask these lovely people what can be done/needs to be done/plans etc for these areas, Slack the best place
* Snip back the white cable haging out the wak outside the chemical room upstairs (Ask Thomas/Yoshi if not sure which one)
+
 
* Extend the Ivar shelf upstairs next to the fire exit where the tools are (so it's 3 shelves wide)
+
*Sewing room - Eweyln & Trude
* 2 man jobbe! Assemble the white gullotine thang (paper cutter) at the top of the stairs in the packing station.
+
*Bioraf    - Heikki
* Put this list/wiki page up on the big television in the lab.
+
*Metal verksted - Trym & Nikolai Kolstad
* The trash gathering in between the kitchen and the exit needs driven to a recycling station, at least, I THINK its trash. -sky
+
*Casting/Molding - Geir Sire
  
 
==Things that have been done==
 
==Things that have been done==
White chairs cleaned except one, which has some difficult stains. (Lars, keeping his secrets)
 
  
 
[[Category:BV9]]
 
[[Category:BV9]]
 +
*Shopbot/CNC.    -
 +
*Smut Cave.    -  Elias Bakken/Jensa
 +
*3D printer room  -  Hermann
 +
*Laser room      -

Revisjonen fra 22. aug. 2022 kl. 21:05

When you enter, look straight ahead, and by the stairs there is a flip chart and a whiteboard with småjobber that can be done to help Bitraf get up to speed! There are whiteboard pens available there to mark off when done and please put your name so we can say thanks later!


Things that need to be done

  • Are on the whiteboard, pls mark when done and put your name!
  • Anything you don't know/understand, can ask Yoshi or Thomas Winther on Slack. Other members may also know!

Things that are in progress

Here are the responsible people for each section of Bitraf, ask these lovely people what can be done/needs to be done/plans etc for these areas, Slack the best place

  • Sewing room - Eweyln & Trude
  • Bioraf - Heikki
  • Metal verksted - Trym & Nikolai Kolstad
  • Casting/Molding - Geir Sire

Things that have been done

  • Shopbot/CNC. -
  • Smut Cave. - Elias Bakken/Jensa
  • 3D printer room - Hermann
  • Laser room -